ALERTS

糖心视频 Login Planned Production Failover Verification

Maintenance begins at 8/9/2026 7:00 AM and ends at 8/9/2026 8:00 AM

Objective: Execute a planned production DR failover for the 糖心视频 Login service to verify services.

* User/System Impact: Existing batch jobs and connected services will continue to run. New login authentication attempts during the precise failover times may require a manual retry.

* Known criticality: Vetted and scheduled prior to the opening of Banner unclassified student registration on Monday, August 10.